PROJECT 1313:
2425 Atwood Ave
Submitted by: Schreiber Anderson Associates Project type: Permitted Use Description: Rezoned to allow restaurant and second floor apartment Status: completed on 7/22/2009
Project has been completed.
Agency Status Requirements Remarks Checkout Date Reviewed Zoning approved 1 2 3 2/24/2009 2/25/2009 Traffic Engineering approved 2/23/2009 2/23/2009 Fire approved 2/24/2009 2/26/2009 Engineering approved 1 2 2/24/2009 2/24/2009 Planning approved 2/25/2009 2/25/2009 Lighting approved 1 2/26/2009 2/26/2009 Engineering Mapping approved 1 2/26/2009 2/26/2009 Revision Submit date original 1/29/2009 1 2/20/2009
Engineering
Note:
Supplementary Condition Completed (was "3.18 All tree locations and tree species shall be reviewed and approved by the City Forestry. Please submit a tree planting plan to Dean Kahl, of the City Parks Department. Dean can be reached at 608-266-4816.")
Note:
Supplementary Condition Completed (was Sidewalk and driveway work shall require a street excavation permit per comment #6 rezoning letter from Planning Division dated 1-7-09.)
Top
Engineering Mapping
Note:
Supplementary Condition Completed (was The applicant shall dedicate a two foot wide permanent limited easement for sidewalk along Atwood Avenue and relocate the existing sidewalk in accordance with plans prepared and/or approved by the City Engineer. The existing terrace has a tree surrounded by a tree grate and the tree grate measures approximately 4 feet by 4 feet. Approximately one half of the tree grate is located in the main line sidewalk because the terrace is extremely narrow. These tree grates are problematic because they are small and the roots to the trees heave the tree grates causing a trip hazard in the main line sidewalk. The two foot easement allows the sidewalk to be relocated away from the tree and the tree grate to be removed. NOTE: The owner/applicant shall decide whether the required sidewalk easement is to be conveyed to the City of Madison by the recording of a Certified Survey Map or by separate recorded easement conveyance document administered by the City of Madison Office of Real Estate Services.)
Top
Lighting
Note:
Did not submit a new lighting plan. Assumed previous plan is still accurate.
Top
Zoning
Note:
Signage approvals are not granted by the Plan Commission. Signage must be reviewed for compliance with Chapter 31 Sign Code of the Madison General Ordinances and Chapter 33 Urban Design District ordinaces. Sign permits are issued by the Zoning Section of the Department of Planning and Community and Economic Development.
Note:
Obtain a Certificate of Occupancy for the building conversion, once approved (Occupancy of the dwelling unit is restricted to the maximum allowed per the City's family definition, Chapter 28 of the Madison General Ordinances.)
Note:
The submitted Parking Stall Reduction Request Application has been approved.