PROJECT 1313: 2425 Atwood Ave

Submitted by:Schreiber Anderson Associates
Project type:Permitted Use
Description:Rezoned to allow restaurant and second floor apartment
Status:completed on 7/22/2009

Project has been completed.

AgencyStatusRequirementsRemarksCheckout DateReviewed
Zoningapproved 1  2  32/24/20092/25/2009
Traffic Engineeringapproved  2/23/20092/23/2009
Fireapproved  2/24/20092/26/2009
Engineeringapproved 1  22/24/20092/24/2009
Planningapproved  2/25/20092/25/2009
Lightingapproved 12/26/20092/26/2009
Engineering Mappingapproved 12/26/20092/26/2009

RevisionSubmit date
original1/29/2009
12/20/2009


Engineering 

Note: Supplementary Condition Completed (was "3.18 All tree locations and tree species shall be reviewed and approved by the City Forestry. Please submit a tree planting plan to Dean Kahl, of the City Parks Department. Dean can be reached at 608-266-4816.")

Note: Supplementary Condition Completed (was Sidewalk and driveway work shall require a street excavation permit per comment #6 rezoning letter from Planning Division dated 1-7-09.)

Top
Engineering Mapping 

Note: Supplementary Condition Completed (was The applicant shall dedicate a two foot wide permanent limited easement for sidewalk along Atwood Avenue and relocate the existing sidewalk in accordance with plans prepared and/or approved by the City Engineer. The existing terrace has a tree surrounded by a tree grate and the tree grate measures approximately 4 feet by 4 feet. Approximately one half of the tree grate is located in the main line sidewalk because the terrace is extremely narrow. These tree grates are problematic because they are small and the roots to the trees heave the tree grates causing a trip hazard in the main line sidewalk. The two foot easement allows the sidewalk to be relocated away from the tree and the tree grate to be removed. NOTE: The owner/applicant shall decide whether the required sidewalk easement is to be conveyed to the City of Madison by the recording of a Certified Survey Map or by separate recorded easement conveyance document administered by the City of Madison Office of Real Estate Services.)

Top

Lighting 

Note: Did not submit a new lighting plan. Assumed previous plan is still accurate.

Top

Zoning 

Note: Signage approvals are not granted by the Plan Commission. Signage must be reviewed for compliance with Chapter 31 Sign Code of the Madison General Ordinances and Chapter 33 Urban Design District ordinaces. Sign permits are issued by the Zoning Section of the Department of Planning and Community and Economic Development.

Note: Obtain a Certificate of Occupancy for the building conversion, once approved (Occupancy of the dwelling unit is restricted to the maximum allowed per the City's family definition, Chapter 28 of the Madison General Ordinances.)

Note: The submitted Parking Stall Reduction Request Application has been approved.