PROJECT 1345: 1308 W Dayton St

Submitted by:Workshop Architects for UW Madison
Project type:PUD(GDP)
Description:UW South Campus Union
Status:inactivated on 9/15/2009 (from supplement needed)

Project has been cancelled.

AgencyStatusRequirementsRemarksCheckout DateReviewed
Zoningapproved 1  2  33/18/20095/8/2009
Traffic Engineeringapproved  3/19/20093/26/2009
Firesupplement needed1 3/19/20093/23/2009
Engineeringapproved 1  2  3  4  5  6  7  83/17/20093/19/2009
Planningapproved 1  2  33/20/20093/25/2009
Lightingapproved 13/18/20093/18/2009
Metroapproved  3/19/20093/19/2009
Waterapproved  5/5/20095/5/2009
Urban Design Commissionapproved 1  23/19/20093/31/2009
Engineering Mappingsupplement needed1  2  34  53/18/20093/20/2009

RevisionSubmit date
original3/16/2009


Engineering 

Note: It is City Engineering's understanding that a soil nailing/soil retention system will not be needed until after the SIP for this site is approved. The demolition and excavation that will take place following the approval fo the demo/PUD-GDP will use OSHA safe side slopes. Soil nailing/soil retention plans must be submitted to and approved by City Engineering prior to their implementation if site conditions change/require their use.

Note: The CSM involving the vacation of the portion of West Johnson Street must be completed prior to approval of the SIP.

Note: Erosion Control permit was completed for this entire site with the start of demoltion at 1314 W. Johnson Street. The existing permit and erosion control plans will be updated as the PUD-GDP and SIP are reviewed/approved.

Note: Stormwater management calcs/reports will need to be submitted with the SIP when it is submitted for review.

Note: Complete drainage and storm sewer plans will need to be reviwed with the SIP submittal. The plans included with the PUD-GDP show inlets and drains that are not connected to any storm sewer sytem. Detail sheets and complete storm sewer plans will need to be included in the SIP submittal

Note: Supplementary Condition Completed (was Provide copy of sewer connection permit from Madison Metropolitan Sewer District (MMSD) for the connection on Randall. Copy of approved permit is required before sign-off on the PUD-GDP.)

Note: Supplementary Condition Completed (was The Developer's Agreement must be completed prior to sign-off on the PUD-GDP plans. Contact Janet Dailey at 608-261-9688 to resolve any outstanding issues with the agreement and it's completion.)

Note: Supplementary Condition Completed (was Submit PDF's of the PUD-GDP plans for Engineering records. Files can be emailed to Tim Troester at ttroester@cityofmadison.com or disks dropped off at the Engineering office (City-County Bldg, Rm 115) to Tim's attention.)

Top
Engineering Mapping 

Supplementary material required: The applicant shall coordinate the final limits for vacated West Johnson Street with Eric Pederson in Engineering Mapping (EPederson@cityofmadison.com). A JSD Inc. staff Registered Land Surveyor shall prepare a map and legal description for the final West Johnson Street right-of-way to be vacated between "new" North Randall Avenue and the RR, based on final plans approved by the City Engineer.

Supplementary material required: The UW has authorized JSD Inc. to prepare, submit for city approval, and record a Certified Survey Map of this site. The sooner the submittal of this CSM occurs, the better, for coordination with all land records issues related to this site.

Supplementary material required: A JSD Inc. staff Registered Land Surveyor shall also prepare a map and legal description for the proposed and existing sidewalk as a result of this project along the west right-of-way line of North Randall Avenue across the street from this subject site. Also coordinate this with Eric Pederson in Engineering Mapping (EPederson@cityofmadison.com).

Note: Supplementary Condition Completed (was Submit a PDF of all floor plans to Lori Zenchenko ( Lzenchenko@cityofmadison.com ) and coordinate an addressing plan for this site. If there are any changes pertaining to the location of a building/unit, the deletion or addition of a building/unit, or changes to the location of entrances into any building/unit, (before, during or after construction) the addresses may need to be changed. The interior address plan is subject to the review and approval of the Fire Marshal.)

Note: Supplementary Condition Completed (was The Applicant shall submit, prior to plan sign-off, a digital CAD file (single file) to the Engineering Program Specialist in the Engineering Division (Lori Zenchenko). The digital CAD file shall be to scale and represent final construction. The single CAD file submittal can be either AutoCAD (dwg) Version 2001 or older, MicroStation (dgn) Version J or older, or Universal (dxf) format and contain the only the following data, each on a separate layer name/level number: a) Building Footprints; b) Internal Walkway Areas; c) Internal Site Parking Areas; d) Other Miscellaneous Impervious Areas (i.e. gravel, crushed stone, bituminous/asphalt, concrete, etc.); e) Right-of-Way lines (public and private); f) All Underlying Lot lines or parcel lines if unplatted; g) Lot numbers or the words “unplatted”; h) Lot/Plat dimensions; i) Street names. All other levels (contours, elevations, etc) are not to be included with this file submittal. NOTE: Email file transmissions preferred Lzenchenko@cityofmadison.com . Include the site address in the subject line of this transmittal. Any changes or additions to the location of the building, sidewalks, parking/pavement during construction will require a new CAD file.)

Top

Fire 

Supplementary material required: Submit a site plan that clearly identifies the location of all fire lanes and hydrants.

Top

Lighting 

Note: No lighting plans were submitted. Please submit one copy of a photometric plot and fixture cut sheets before construction.

Top

Planning 

Note: The Common Council has approved the street vacation, however there are outstanding conditions of approval that shall be met before final sign-off of the SIP. Contact City Engineering for further information.

Note: Supplementary Condition Completed (was Please submit a revised zoning text, removing the permitted use designation for “special outdoor events” and “private vending” that were not included in the text approved by the Common Council. These uses can be considered in a revised zoning text submitted for SIP approval. Clarify that details of operation of outdoor performance venues and outdoor dining will be provided as part of the SIP approval process.)

Note: Supplementary Condition Completed (was Provide a copy of the massing diagrams and renderings to complete the plan set.)

Top

Urban Design Commission 

Note: Supplementary Condition Completed (was Provide copies of the perspective renderings and colored elevations utilized to obtain approval by the Urban Design Commission .)

Note: Supplementary Condition Completed (was Provide copies of the perspective renderings and colored elevations utilized to obtain approval by the Urban Design Commission .)

Top

Zoning 

Note: The recycling and reuse plan has been submitted and approved by the Recycling Coordinator.

Note: Supplementary Condition Completed (was The spacing of the proposed U-bike racks appears to be inadequate. A bike parking space is a minimum of 2 feet by 6 feet with a 5 foot wide access aisle. For the PUDSIP submittal, show that the bike parking spaces meet the minimum size requirements.)

Note: Supplementary Condition Completed (was The handicap accessible stalls do not meet code requirements. Access aisles shall extend the full length of the parking spaces they serve and cannot be obstructed with columns. For the PUDSIP submital, handicap accessible stalls must meet all applicable State requirements, and accessible signage must be posted at the head of the stalls.)