PROJECT 1371: 2310 Daniels St

Submitted by:Louis Gander
Project type:Permitted Use
Description:Interior alterations / change of use
Status:supplement needed

Supplementary documents will be accepted.

AgencyStatusRequirementsRemarksCheckout DateReviewed
Engineeringapproved 14/27/20094/28/2009
Traffic Engineeringapproved  4/22/20094/23/2009
Fireapproved  4/23/20094/25/2009
Engineering Mappingsupplement needed1 4/29/20095/4/2009
Zoningsupplement needed1  2  3  4 5/12/20095/12/2009

RevisionSubmit date
original4/22/2009


Engineering 

Note: Less than 4,000 sf disturbed area, no Erosion Control & Storm Water Management Permit required. Internal changes only.

Top
Engineering Mapping 

Supplementary material required: The Applicant shall submit, prior to plan sign-off, a digital CAD file (single file) to the Engineering Program Specialist in the Engineering Division (Lori Zenchenko). The digital CAD file shall be to scale and represent final construction. The single CAD file submittal can be either AutoCAD (dwg) Version 2001 or older, MicroStation (dgn) Version J or older, or Universal (dxf) format and contain the only the following data, each on a separate layer name/level number: a) Building Footprints; b) Internal Walkway Areas; c) Internal Site Parking Areas; d) Other Miscellaneous Impervious Areas (i.e. gravel, crushed stone, bituminous/asphalt, concrete, etc.); e) Right-of-Way lines (public and private); f) All Underlying Lot lines or parcel lines if unplatted; g) Lot numbers or the words “unplatted”; h) Lot/Plat dimensions; i) Street names. All other levels (contours, elevations, etc) are not to be included with this file submittal. NOTE: Email file transmissions preferred Lzenchenko@cityofmadison.com . Include the site address in the subject line of this transmittal. Any changes or additions to the location of the building, sidewalks, parking/pavement during construction will require a new CAD file.

Top

Zoning 

Supplementary material required: A landscape plan stamped by a licensed landscape architect.

Supplementary material required: Landscape form showing points and trees.

Supplementary material required: Obtain a parking stall reduction for the site.

Supplementary material required: Provide a minimum of 4 bicycle parking stalls on the site.

Top