PROJECT 1397:
8133 Mansion Hill Ave
| Submitted by: | The Architects ltd |
| Project type: | Minor Alteration to PUD(SIP) |
| Description: | Enlargement of dumpster enclosure |
| Status: | supplement needed |
Supplementary documents will be accepted.
| Agency | Status | Requirements | Remarks | Checkout Date | Reviewed |
| Zoning | approved | | | 5/27/2009 | 5/27/2009 |
| Traffic Engineering | approved | | | 5/29/2009 | 6/1/2009 |
| Engineering | supplement needed | 1 | | 5/28/2009 | 5/29/2009 |
| Planning | approved | | | 5/22/2009 | 5/22/2009 |
| Urban Design Commission | supplement needed | 1 | | 5/26/2009 | 6/2/2009 |
| Engineering Mapping | supplement needed | 1 | | 5/29/2009 | 6/3/2009 |
Engineering
Supplementary material required:
Submit PDF of revised site plan for Engineering records. File can be emailed to Tim Troester at ttroester@cityofmadison.com
Top
Engineering Mapping
Supplementary material required:
The Applicant shall submit, prior to plan sign-off, a digital CAD file (single file) to the Engineering Program Specialist in the Engineering Division (Lori Zenchenko). The digital CAD file shall be to scale and represent final construction. The single CAD file submittal can be either AutoCAD (dwg) Version 2001 or older, MicroStation (dgn) Version J or older, or Universal (dxf) format and contain the only the following data, each on a separate layer name/level number: a) Building Footprints; b) Internal Walkway Areas; c) Internal Site Parking Areas; d) Other Miscellaneous Impervious Areas (i.e. gravel, crushed stone, bituminous/asphalt, concrete, etc.); e) Right-of-Way lines (public and private); f) All Underlying Lot lines or parcel lines if unplatted; g) Lot numbers or the words “unplatted”; h) Lot/Plat dimensions; i) Street names. All other levels (contours, elevations, etc) are not to be included with this file submittal. NOTE: Email file transmissions preferred Lzenchenko@cityofmadison.com . Include the site address in the subject line of this transmittal. Any changes or additions to the location of the building, sidewalks, parking/pavement during construction will require a new CAD file.
Top
Urban Design Commission
Supplementary material required:
Provide full size amended site plan .
Top