PROJECT 1460: 6001 Manufacturers Dr

Submitted by:HSR Associates, Inc.
Project type:Permitted Use
Description:Armed Forces Reserve Center
Status:supplement needed

Supplementary documents will be accepted.

AgencyStatusRequirementsRemarksCheckout DateReviewed
Zoningapproved 1  29/24/20099/24/2009
Traffic Engineeringapproved 19/17/20099/21/2009
Fireapproved 19/21/20099/23/2009
Engineeringsupplement needed1  2  349/18/20099/24/2009
Lightingapproved 19/17/20099/17/2009
Real Estatesupplement needed1 9/25/200910/20/2009
Engineering Mappingapproved 19/23/20099/25/2009

RevisionSubmit date
original7/22/2009
19/17/2009


Engineering 

Supplementary material required: All outstanding Madison Metropolitan Sewerage District (MMSD) and City of Madison sanitary sewer connection charges are due and payable prior to plan approval.

Supplementary material required: Need notary signed maintenance agreement by owner for the bioretention basins. Contact Jeff Benedict for boilerplate and Exhibit A language.

Supplementary material required: Need ROW permit for extension of 66 inch RCP storm sewer and 66 inc RCP culvert under drive openings.

Note: Supplementary Condition Completed (was Provide assurance that bikepath is paved the entire length of the site (lots 16 through 20))

Top
Engineering Mapping 

Note: Supplementary Condition Completed (was Engineering Mapping previously received CAD files, but will need the updated C0001 sheet and base CAD file which includes the updated building footprint.)

Top

Fire 

Note: Per MGO 34.20, The following requirements are in addition to the requirements in IFC Section 508.1:(1) Fire Protection Water Supply and Fire Hydrants.(a) Private fire hydrants and water mains shall be installed in accordance with NFPA24, and the City of Madison Standard Specifications for Public Works Construction,Sec. 704.7. Private fire hydrants and water mains shall be maintained in accordance with NFPA 25. (e) Minimum Flow and System Design.1. Private fire service mains serving fire hydrants shall be the same size as the public mains supplying the private water system unless hydraulically calculated to provide the minimum required flow and pressure in accordance with nationally recognized standards. In all cases, mains do not need to exceed 10 inches but shall be at least six inches in diameter. You need to Confirm the size of the street main and install the correct pipe size to the new hydrants. 2. Control valves shall be provided to limit the number of private hydrants affected by maintenance, repair or construction. There is one shut off valve for 2 hydrants, there shall be one shut off for each hydrant.

Top

Lighting 

Note: No changes from the previously approved plan.

Top

Real Estate 

Supplementary material required: Real Estate's conditions are the same as Engineering's conditions. Once Engineering's conditions are met, Real Estate will sign off also.

Top

Traffic Engineering 

Note: Supplementary Condition Completed (was The Driveway Approach form is already filled out in Traffic Engineering Office and requires only the fee and deposit to be paid as noted prior to site approval. “Permit to Construct Commercial Driveway Approach.” The Driveway Approach Fee $200.00 M.G.O. and Deposit to Insure Conduit $None Make Check Payable to the City of Madison Treasurer to be delivered or mailed to Attention John Leach, Traffic Engineering, Madison Municipal Building, Suite 100, 215 Martin Luther King Jr. Blvd., P.O. Box 2986, Madison, Wisconsin 53701-2986. If the Board of Public Works approve the approaches. )

Top

Zoning 

Note: The Center for Industry and Commerce Design Review Board has approved this project.

Note: 48 bike parking stalls are required. 27 bike stalls will be provided. Land area for provision of the 21 deferred bike stalls will be maintained in reserve until such time as they may be needed.