PROJECT 1497:
6000 American Pkwy
| Submitted by: | Ruekert-Mielke |
| Project type: | Minor Alteration to CU |
| Description: | new turn-about and site improvements |
| Status: | completed on 9/29/2009 |
Project has been completed.
| Agency | Status | Requirements | Remarks | Checkout Date | Reviewed |
| Zoning | approved | | | 9/17/2009 | 9/17/2009 |
| Traffic Engineering | approved | | | 9/17/2009 | 9/18/2009 |
| Fire | approved | | | 9/17/2009 | 9/17/2009 |
| Engineering | approved | | 1 | 9/18/2009 | 9/24/2009 |
| Planning | approved | | | 9/21/2009 | 9/21/2009 |
| Engineering Mapping | approved | | 1 | 9/23/2009 | 9/25/2009 |
| Revision | Submit date |
| original | 8/25/2009 |
| 1 | 9/17/2009 |
Engineering
Note:
Supplementary Condition Completed (was Submit plan sheets in pdf format to jbenedict@cityofmadison.com.)
Top
Engineering Mapping
Note:
Supplementary Condition Completed (was The Applicant shall submit, prior to plan sign-off, a digital CAD file (single file) to the Engineering Program Specialist in the Engineering Division (Lori Zenchenko). The digital CAD file shall be to scale and represent final construction. The single CAD file submittal can be either AutoCAD (dwg) Version 2001 or older, MicroStation (dgn) Version J or older, or Universal (dxf) format and contain the only the following data, each on a separate layer name/level number: a) Building Footprints; b) Internal Walkway Areas; c) Internal Site Parking Areas; d) Other Miscellaneous Impervious Areas (i.e. gravel, crushed stone, bituminous/asphalt, concrete, etc.); e) Right-of-Way lines (public and private); f) All Underlying Lot lines or parcel lines if unplatted; g) Lot numbers or the words “unplatted”; h) Lot/Plat dimensions; i) Street names. All other levels (contours, elevations, etc) are not to be included with this file submittal. NOTE: Email file transmissions preferred Lzenchenko@cityofmadison.com . Include the site address in the subject line of this transmittal. Any changes or additions to the location of the building, sidewalks, parking/pavement during construction will require a new CAD file.)
Top