PROJECT 1502:
202 S Park St
Submitted by: Potter Lawson, Inc. Project type: PUD(GDP)(SIP) Description: Meriter Hospital Campus Plan Status: completed on 10/7/2009
Project has been completed.
Agency Status Requirements Remarks Checkout Date Reviewed Zoning approved 9/14/2009 9/21/2009 Traffic Engineering approved 1 9/4/2009 9/21/2009 Fire approved 1 9/9/2009 9/11/2009 Engineering approved 1 2 3 4 5 6 7 8 9/9/2009 9/10/2009 Planning approved 1 2 3 4 5 6 9/16/2009 9/16/2009 Urban Design Commission approved 9/11/2009 9/15/2009 Engineering Mapping approved 1 2 3 9/10/2009 9/16/2009 Revision Submit date original 9/4/2009
Engineering
Note:
The implementation of the plan shall require additional right of way on Regent Street, Brooks Street,and other possible locations. The developer shall obtain the necessary right of way as required bythe City Engineer and City Traffic Engineer and shall dedicate the right of way to the City.
Note:
The 10-year plan improvements should be closely coordinated with the City for any work onadjacent streets or utility infrastructure within said streets.
Note:
The developer shall make improvements to Regent Street, Brooks Street, and other adjacentstreets as required by the City Engineer and City Traffic Engineer. The schedule for theimprovements shall be determined by the City Engineer and City Traffic Engineer after consultationwith the developer, and the City shall consider the traffic impact of each additional building whendetermining at what time additional improvements to the adjacent roadway are warranted.
Note:
The planned improvements may require additional public sanitary sewer capacity. Meriter shallestimate future needs and provide the information to the City at least 12 months in advance of anysignificant increased need. Some or all of the cost of provide additional sewer capacity, may be theresponsibility of Meriter.
Note:
The construction of this building will require removal and replacement of sidewalk, curb and gutterand possibly other parts of the City’s infrastructure. The applicant shall enter into a City / Developeragreement for the improvements required for this development. The applicant shall be required toprovide deposits to cover City labor and materials and surety to cover the cost of construction. Theapplicant shall meet with the City Engineer to schedule the development of the plans and theagreement. The City Engineer will not sign off on this project without the agreement executed bythe developer. The developer shall sign the Developer’s Acknowledgement prior to the CityEngineer signing off on this project.
Note:
The approval of this Planned Unit Development does not include the approval of the changes toroadways, sidewalks or utilities. The applicant shall obtain separate approval by the Board of PublicWorks and the Common Council for the restoration of the public right of way including any changesrequested by developer. The City Engineer shall complete the final plans for the restoration withinput from the developer. The curb location, grades, tree locations, tree species, lightingmodifications and other items required to facilitate the development or restore the right of way shallbe reviewed by the City Engineer, City Traffic Engineer, and City Forester.
Note:
The site plan shall be revised to show all existing public sanitary sewer facilities in the project areaas well as the size, invert elevation, and alignment of the proposed service.
Note:
Supplementary Condition Completed (was Sumbit PDF's of the plans for Engineering records. Files can be emailed to Tim Troester at ttroester@cityofmadison.com)
Top
Engineering Mapping
Note:
Coordination and approval of site addresses will occur at the time of individual applicant plan submittals to the city for implementation of components contained within this master plan.
Note:
Necessary right-of-way dedications to the city as required by this development plan may be more efficiently (time and monetarily) accomplished by Subdivision Plat and/or Certified Survey Map applications rather than administration of conveyance documents by the Office of Real Estate Services staff and associated fees.
Note:
Final CAD file submittals will be requested at the time of individual applicant plan submittals as well.
Top
Fire
Note:
No comments on the General plan at this time. Note: All new buildings and additions will be looked at individually.
Top
Planning
Note:
As part of the first specific implementation plan approval for construction of a new building within the Meriter campus, the applicant shall review the Transportation Demand Management Plan and detailed parking plan to explore alternatives to reduce parking for the entire Park Street Campus PUD.
Note:
Supplementary Condition Completed (was The Landmarks Commission recommended approval of the planned unit development with the requirement that the addition to Longfellow School be limited to 65 feet in height; the PUD-GDP zoning text and any related PUD exhibits shall be amended to reflect this height limitation accordingly. )
Note:
Supplementary Condition Completed (was Per the condition of approval, the following statement shall be added to the general development plan zoning text: “The building density and intensity of proposed development outlined in the master general development plan may or may not be ultimately achieved upon full build-out of the overall Meriter Park Street Campus Planned Unit Development. The development proposed beyond the initial SIP shall require review and approval of an amended Specific Implementation Plan for each phase of additional development outlined in the master plan. Each phase shall be reviewed against the standards included in the Planned Unit Development section of the Zoning Ordinance.")
Note:
Supplementary Condition Completed (was The applicant shall meet with Planning Division staff to discuss the final form of the PUD prior to final approval of the PUD for recording.)
Note:
Supplementary Condition Completed (was The hours of operation shall be posted in a prominent location outside the loading dock(s).)
Note:
Supplementary Condition Completed (was Per the condition of approval, noise and air emissions at the Central Physical Plant shall be monitored and records retained and that those records shall be made available to the City of Madison at its request.)
Top
Traffic Engineering
Note:
Supplementary Condition Completed (was The applicant will need to revise p 39, 40 and 42 as per email to applicant on 9/12/09. The applicant will need to resubmit revised copies of the above sheet to Traffic Engineering office as sumpplements.)
Top