PROJECT 1509: 10150 Mid Town Rd

Submitted by:City of Madison Engineering Division
Project type:Conditional Use
Description:Lower Badger Mill Creek Lift Station
Status:completed on 9/23/2009

Project has been completed.

AgencyStatusRequirementsRemarksCheckout DateReviewed
Zoningapproved  9/18/20099/18/2009
Traffic Engineeringapproved 19/14/20099/21/2009
Fireapproved  9/17/20099/17/2009
Engineeringapproved  9/14/20099/14/2009
Planningapproved 19/16/20099/16/2009
Engineering Mappingapproved 19/14/20099/23/2009

RevisionSubmit date
original9/11/2009


Engineering Mapping 

Note: Supplementary Condition Completed (was The Applicant shall submit, prior to plan sign-off, a digital CAD file (single file) to the Engineering Program Specialist in the Engineering Division (Lori Zenchenko). The digital CAD file shall be to scale and represent final construction. The single CAD file submittal can be either AutoCAD (dwg) Version 2001 or older, MicroStation (dgn) Version J or older, or Universal (dxf) format and contain the only the following data, each on a separate layer name/level number: a) Building Footprints; b) Internal Walkway Areas; c) Internal Site Parking Areas; d) Other Miscellaneous Impervious Areas (i.e. gravel, crushed stone, bituminous/asphalt, concrete, etc.); e) Right-of-Way lines (public and private); f) All Underlying Lot lines or parcel lines if unplatted; g) Lot numbers or the words “unplatted”; h) Lot/Plat dimensions; i) Street names. All other levels (contours, elevations, etc) are not to be included with this file submittal. NOTE: Email file transmissions preferred Lzenchenko@cityofmadison.com . Include the site address in the subject line of this transmittal. Any changes or additions to the location of the building, sidewalks, parking/pavement during construction will require a new CAD file.)

Top
Planning 

Note: The final plans appear to conform to the plans approved by the Plan Commission.

Top

Traffic Engineering 

Note: The City of Madison Engineering Department shall issue their own permit for driveway construction on utility projects.

Top